In 2021 P2H delivered 2×60 MW steam boilers to Xinjiang TBEA Group. These are the largest capacity high voltage electrode boilers in China.


In 2021, Inner Mongolia Xinte Silicon Materials Co., Ltd invested in the construction of Phase I: 100,000 ton high-purity polysilicon green energy circular economy construction project. It is the world’s first polycrystalline silicon project with the largest monomer. The project adopts the improved Siemens method and cold hydrogenation process technology. Two 60 MW P2H-Shuangliang electrode boilers with the largest domestic capacity are used for energy security.
Total installed capacity: 120 MW steam.