In 2019 P2H delivered 4×40 MW hot water boilers and 1×30,000 m3 heat storage tank with the purpose of peak load balancing.

The clean energy heating project (coal to electricity) in Linze County builds a new high pressure electrode hot water boiler room with heat storage on the east side of the original heat source plant to use as a central heat source. It will use electric heating and heat storage to meet the needs of 2 million m2 of buildings in the county. In this project, Shuangliang Boiler supplied 4 sets of P2H 40 MW hot water electrode boilers+30,000 m³ heat storage tanks. After the completion of the project, it will have a positive effect on reducing power distribution investment and operating costs, effectively absorb local photovoltaic and wind power resources, lay a solid foundation for deepening clean energy heating, promoting energy transformation, and improving renewable energy consumption and heating reliability.

Total installed capacity: 160 MW steam and 30,000 m3 heat storage.