In 2018/2019 P2H delivered 9×40 MW and 1×25 MW hot water boilers with the purpose to use excess electricity from wind- and hydropower.



Total installed capacity: 385 MW hot water.
In 2018/2019 P2H delivered 9×40 MW and 1×25 MW hot water boilers with the purpose to use excess electricity from wind- and hydropower.



Total installed capacity: 385 MW hot water.